After finishing the
settings you may start balancing. The panel below lists each step with the relevant information.
List of measuring runs
|
The table lists all balancing runs belonging to the balancing session. Some entries are divided into steps. Click the respective run or step to see the belonging settings.
The button Discard all runs and restart opens a new balancing session.
|
There are the following types of balancing runs:
-
Pilot survey detects the optimum rotation speed for the rotor.
-
Test runs determine the dynamical properties of the rotor.
-
Verification runs suggest correction measures and show whether their application was successful.
|
|
Side display
|
Shows compiled information about the current run.
|
|
|
Main display
Shows further detailed information.
|
|
Scroll bar
|
Scroll up and down if not all areas are visible.
|
|
|